HVAC Permitting And Inspection Process In Raleigh, NC
Many home renovation and new HVAC installed in Raleigh, North Carolina, require a permit before they can begin. The permitting and inspection processes allow the Town of Raleigh to guarantee that projects comply with minimum code requirements and that structures are well-built and occupant safe. If you add square footage to your property without a permit and then want to sell it, the project will need to be licensed and inspected before the sale can be completed.
The following HVAC additions require a permit in Raleigh:
If a permit is required, Raleigh requires us to pull the heating and Air Conditioning Permits a minimum of one business day before work begins.
After the work is completed, the town of Raleigh requires an HVAC inspection within 10 business days after the last day of completion.
We will work with the homeowner to arrange a day and time by
mail/phone/text (homeowner preference). The homeowner will need to be home until the inspector shows up.